SURMASIS PHARMACEUTICAL

Back to Our Work

HCC provided design build service for 15,000 sf of ISO 7 and ISO 8 cGMP compliant space for the Cell Therapy/Biopharma company.

HCC provided CM agency, with the owner holding the subcontracts, after HCC put the work out to bid.

HCC provided project management and full onsite supervision.

HCC self-performed the installation of the walls, ceilings and doors.

Walls and ceilings were Plascore UPVC Pharma Wall.

Other highlights included a new chilled water plant, new HVAC system, controls system, extension and modification of an existing plumbing system, as well as compressed air, and electrical upgrades.

  • LOCATION

    Des Moines, IA
  • INDUSTRY

    biopharmaceutical
  • PROJECT TYPE

    Design/Build
  • ISO CLASS

    ISO 7 and ISO 8
  • SIZE

    15,000 sf
  • PROJECT SCHEDULE

    5 months
  • PROJECT COST

    $4,500,000